To achieve professional-quality epoxy floors, follow these detailed steps. Start by thoroughly preparing your surface. Remove any old flooring and clean the area of debris, dirt, and oil stains.
Use a hand grinder to open and clean out any cracks. Fill these cracks with floor patch epoxy gel, smoothing the surface with a stiff putty knife. Allow the patch to cure for 4 to 8 hours before grinding the entire concrete surface, either with a hand grinder or a walk-behind grinder, depending on your project size. This grinding ensures a strong bond with the moisture seal.
Next, apply a thin layer of moisture seal, about one ounce per square foot. Spread it evenly using a roller and squeegee. Let this cure for 24 hours.
The following day, sand the surface to remove any imperfections and clean off dust. Prepare the floor epoxy midcoat by mixing different colors in separate cups. Pour and blend these colors on the surface using a small roller, creating a marble effect. Allow this coat to cure for 1 to 2 days.
Finally, apply the ultimate top coat with a roller, using a wet roll first and a dry roll to even out. This top coat is scratch, stain, and chemical resistant. Allow the floor to cure for 24 hours before light foot traffic and 72 hours before heavy use. Enjoy your newly created epoxy floors!.